RI Title
RI logo
DRAFT: This document is still being modified by the author. Any information here is subject to change.

Engineering Change Notice (ECN) — Cassini Test Instrument Module (TIM)

ECN: RBEH-DRU3HG
Title:
RI8596A 25 GHz Receiver TIM Model No Longer Available For Sale
Change Type:
[Minor / Major / Sustaining / Corrective / Obsolescence / Cost-Down]
Urgency:
[Normal / Expedite / Stop-Ship]




1) Affected Configuration Items
    • Module Name: Cassini TIM RI8596A 25 GHz Receiver
    • TIM Part Number (PN): RI8596A
    • Cassini Short Cut update may be required.


2) Reason / Problem Statement
    • Issue / Driver: Supply constraints
    • Customer / Compliance Impact: None - New Model is backward compatible with existing.
    • Measurement Impact: None.


3) Change Description (What is changing?)
    • Functional change: No functional change.
    • Design change: Updated Module
    • Parameters / Limits: No change
    • Interfaces:
        • Electrical: No Change.
        • Mechanical: No Change.
        • Software: Update may be required.
    • Documentation: [Docs to be revised and version increments]
    • Backwards compatibility: Yes


4) Impact Assessment

Form / Fit / Function (FFF):

    • Form: No Change
    • Fit: No Change
    • Function: No Change
Performance / Metrology:
    • Accuracy/Uncertainty: No Change
    • Repeatability/Reproducibility:No Change
    • Latency/Throughput: No Change
Calibration:
    • Recalibration required? Yes
    • Cal constants / method changes: No Change
    • Calibration fixtures / standards impacted: No Change
Verification & Validation:
    • Regression tests impacted: Receiver
    • New tests required: No Change
Manufacturing / Test:
    • Process/fixture changes: No Change
    • Cycle time / throughput impact: No Change
    • Yields / scrap risk: No Change
    • Special tooling: No Change
Field / Service:
    • Field-upgradeable? Yes
    • Swap criteria: [RMA thresholds / SN range]
    • Downtime risk / mitigation: Plan Production Short Cut release
Supply Chain / Cost:
    • AVL / AML updates: No Change
    • Availability / lead time: [Δ12 weeks]
    • Cost impact (Unit / NRE): +$
    • End-of-Life / Last-Time-Buy: TBD / TBD
Quality / Reliability / Safety:
    • FMEA delta: [New failure modes, severity, occurrence, detection]
    • HALT/HASS / Life test: [Needed? Status]
    • Regulatory: [RoHS/REACH/CE/UKCA/UL/CSA/CB — impacts/unchanged]
    • ESD / Latch-up / Over-voltage: [Mitigations]
Cybersecurity / Data Integrity (if connected):
    • Interfaces: [USB, LAN, PXI, proprietary]
    • Auth/Update signing: [Bootloader/firmware signing, rollback protection]
    • Diagnostic/Debug ports: [Lockdown status]


5) Risks & Mitigations
Risk ID
Description
Likelihood
Impact
Mitigation / Contingency
Owner
Due
R1
R2



6) Implementation Plan

Effective Date / SN Break: [Date] / [First good SN: …] **Phased Rollout:**[Pilot → Limited → Full] **Manufacturing cut-in:**[WO/PO rules, rework vs scrap] **Field upgrade plan:**[Kits, instructions, time, tools] **Dependencies:**[Other ECNs/PCNs, material arrival, approvals] **Training:**[Ops, Quality, Service, Applications] **Communications:**[Internal bulletin, Supplier PCN, Customer notice]`




7) Verification & Acceptance Criteria
    • Test matrix: [List required tests; link test script IDs]
    • Acceptance thresholds: [Numeric criteria with units]
    • Sample size & confidence: [e.g., n=30 @ C=0 AQL 0.65]
    • Data storage / traceability: [MES/PLM record IDs]
    • Sign-off gates: [Pilot pass, MRB exit, PQC sign-off]


8) Documentation & Systems to Update
    • Schematics / PCB layout [Doc IDs → new rev]
    • BOM & AML/AVL [BOM-### vX → vY]
    • Mechanical drawings / STEP [IDs]
    • Firmware/FPGA repos & release notes [Tags, hashes]
    • Calibration procedures & certificates [Doc IDs]
    • Manufacturing work instructions (WI/SOP) [IDs]
    • Test procedures & limits [ATE scripts, limits files]
    • User manual / datasheet / label artwork [IDs]
    • PLM / ERP [Item/Rev status changes]
    • Service docs / field bulletins [IDs]


9) Disposition of Existing Stock / WIP / Returns
    • Raw/Kit/WIP: [Use as-is / Rework / Scrap]
    • Finished Goods: [Rework criteria, quarantine rules]
    • RMA / Field returns: [Segregation and rework path]


10) Approvals
Role
Name
Signature / Date
Design Owner
Systems / Metrology
Manufacturing Engineering
Test Engineering
Quality / Reliability
Supply Chain / Sourcing
Compliance / Safety
Service / Field
Configuration Management (CM)
MRB Chair (if applicable)



Attachments (check all that apply)
    • Updated schematics / layout diffs
    • BOM delta report
    • Firmware/FPGA release notes & binaries
    • Calibration data / MSA report
    • Test limit files & regression results
    • FMEA update
    • Costed BOM and AVL/AML updates
    • Risk register & mitigation plan
    • Customer notice / Supplier PCN (if external)


Quick-Reference (One-Page Summary)

ECN No. / Title:
Scope:
[HW / FW / FPGA / Cal / Test Limits / Docs]
Why:

What changes:

Impacts:

    • FFF: [/ + brief]
    • Performance/Accuracy: [Δ]
    • Calibration: [Req’d?]
    • Manufacturing/Test: [Fixture/Script Δ]
    • Field/Service: [Upgrade path]
    • Cost/Lead time: [Δ]
      Cut-in:
      [Date / SN break]
      Acceptance:
      [Key tests + thresholds]
      Owners:
      [Design / Test / MFG / Quality]
      Approvals:
      [Blocks remaining]


Notes & Tips for Cassini TIMs
    • SCPI/API stability: Document any command additions, removals, or response format changes. Provide a compatibility shim if breaking changes are unavoidable.
    • Calibration: If algorithms or measurement chains change (e.g., ADC path, filtering, linearization), recompute uncertainty and update cal procedures and certificates.
    • FPGA/HDL: Include bitstream ID, synth tool version, and timing closure artifacts. Attach pre/post loopback and BIST results.
    • Test Limits: If test plan or ATE scripts change, attach diffs and limit file versions; rerun regression across historical golden units.
    • Labeling/Traceability: Ensure Rev, FW, and Cal versions are visible in self-test/*IDN? or equivalent identification commands for field traceability.

Published: 03/03/2026 05:15:55 PM Modified: 03/03/2026 05:51:44 PM
Print Email Link
https://roos.com/docs/RBEH-DRU3HG
Roos Instruments CONFIDENTIAL AND PROPRIETARY
©2026 Roos Instruments, Inc. All rights reserved.