Open Document and White "RI" Envelope
- Review this checklist completely before starting.
 - Review Completed Packing List (with instrument serial numbers) compare with actual and report any discrepancies immediately to [email protected].
 - Review Safety Information found in Cassini V93K Operation Manual
 - See Cassini V93K Infrastructure Site Prep Guidelines for details on what is provided by Roos Instruments and what is expected on site by the facility.
 - Apply "Calibration Sticker" to visible location on V93K Infrastructure
 - Keep all boxes and packing material labeled with Do Not Discard to safely return items to the factory for calibration or service.
 
- Use Caution when Unpacking to avoid weight hazards and prevent dropping any equipment.
 - Unpack Cart and Diag Kit Case (Box 6 of 7)
 - Unpack V93K Infrastructure (Box 5 of 7), box(es) of accessories and place on the Cart
 - Unpack and Attach TIMs to V93K Infrastructure (Box 1-4 of 7)
 - Unpack Fixture Case (Box 7 of 7)
 - Follow the Cassini V93K CTH Infrastructure Attach or Remove with Cart procedure
 - Follow Advantest V93000 Setup and Startup Procedures
 
- Follow the steps To Diagnose Fixture or Cassini TIMs in the Cassini V93K SmarTest 8 Saturn Operations User Guide document.
IMPORTANT: After installing, wait at least 2 hour warm up period after "Tester Loaded" message or 10 mins from room temperature for the internal temperature of instruments to stabilize before proceeding with Diagnostics.