RI Title
RI logo





Open Document and White "RI" Envelope
      • Review Completed Packing List (with instrument serial numbers) compare with actual and report any discrepancies immediately to [email protected].
      • Apply "Calibration Sticker" to visible location on V93K Infrastructure

Setup Hardware

      • Unpack Cart and place
      • V93K Infrastructure on the Cart
      • Attach TIMs
      • Follow System Startup Procedure (See ADVANTEST documentation)

Run Diagnostics

      • Run Diagnostics
        IMPORTANT: Wait at least 2 hour warm up period from first unpack or 10 mins from room temperature for the internal temperature of instruments to stabilize.

PrintEmail Link
https://roos.com/docs/RBEH-DGLMJR
ROOS INSTRUMENTS CONFIDENTIAL AND PROPRIETARY
©2025 Roos Instruments, Inc. All rights reserved.