Power Supply for Cassini16
Infrastructure uses QTY 2, redundant, hot-swappable Power Supplies. A failed Power Supply can be "hot" swapped while the tester is running and replaced with a known good unit. However, best practices suggest following the Shutdown procedure and switching the MAIN breaker OFF prior to exchanging these modules.
Inspect the AC POWER GOOD LED and DB POWER GOOD LED. If either is OFF, then replace this unit.
Replace by unscrewing and pulling on the handle to remove the failed unit and replace with the known good unit and tighten screw. Contact [email protected] to request an RMA to exchange or replace.
Related Documents:
Opening the PSU panel is described "Power Supply Module Service Panel" in the doc below.
Advanced Troubleshooting - Cassini 16 Infrastructure (RI8568B) https://roos.com/docs/RBEH-8W5NLM